Stockholm Tennis Open 2019



Stockholm Tennis Open 
2019

Nepo Kitchen Consulting was involved in all the catering aspects of the recent ATP tennis open at Stockholms Kungliga Tennis Hallen,
October 2019.

doubles match in progress

What a great venue, get up as close as you can to the players and the action you can really feel the tension and atmosphere. the stadium itself is in fantastic condition a little "stadium" time capsule, well maintained,  comfortable, well appointed and with unrestricted vision for all in comparison to the modern cement and plastic stadiums. It's easy to understand why this tournament is a favorite among both the spectators and players. 

the royal venue

Stockholms premier tennis venue the Royal Tennis Hall was built in 1943.
The "kungliga tennishallen", now has a hard-court surface and is the annual venue of the men's Stockholm Open tournament which has ben held here since 1969.
The hall is regularly used for major and club tournaments as well as previous commercial ventures including car launches, boxing bouts and various iconic concerts the likes of Louis Armstrong, David Bowie, the Rolling Stones and the Beatles before they attracted audiences larger than the 5000 seat capacity.

the buffet setup
The buffet set up in the sponsor village was designed for fast service "between matches" 3 buffets with 6 pick up sides and plenty of space between, big enough to swallow 750 guests in a few minutes with as short cue as possible. The three cold buffets were complimented with two dessert/coffee stations and three hot carvery/ hot stations.  

buffet space in the hall
The big buffet hall was built on two indoor tennis courts, a big space and high in the ceiling, we had a prep kitchen, staff area and storage behind the partisans on the right hand side. the flow worked well allowing easy access to the back kitchen area and to refill the buffet. The ambience improved with adjusted lighting, candles and spots. 

sponsor areas
Sponsor groups were divided into their respective areas, with their own bar areas and access to the buffet, the logistics worked well, standing tables but labour intensive.

fast food kitchen

Our fast food kitchen, was also a temporary kitchen, built with the focus on speed of service, 5-6 hot dishes, so the spectators could get back to the tennis ASAP, it worked well and we were catering for about 800 hot meals and 500 cold meals on our busiest days. 
There were a few disgruntled punters but its always a difficult ratio, service brief = speed / quality & expectations = price.

Nothing is possible without a great, flexible, ambitious and experienced team, Thanks team.

tennis results
And there was tennis as well, when you are focused on the drift and organisation there's not much of a chance to see or watch the event, but here it is theres always a winner.




Comments

Popular Posts